{"id":24780,"date":"2025-12-19T12:31:42","date_gmt":"2025-12-19T11:31:42","guid":{"rendered":"https:\/\/imredd.fr\/?p=24780"},"modified":"2026-01-12T18:34:49","modified_gmt":"2026-01-12T17:34:49","slug":"one-year-of-5g-in-the-metro-first-results-and-outlook","status":"publish","type":"post","link":"https:\/\/imredd.fr\/en\/un-an-de-5g-metro-premiers-resultats-et-perspectives\/","title":{"rendered":"One Year of 5G Metro : Milestones, Momentum and the Road Ahead"},"content":{"rendered":"<p>Launched in December 2024, the 5G Metro project has completed its first year of implementation, marking an important milestone in its ambition to build inclusive, human-centered digital learning environments. Co-led by Orange, Awabot, and IMREDD at Universit\u00e9 C\u00f4te d\u2019Azur, the project brings together cutting-edge telecommunications, robotics, and academic research to address educational inequality and social isolation through 5G-powered telepresence.<\/p>\n<h2>Solid Foundations and Concrete Experimentations<\/h2>\n<p>The indoor 5G coverage system, based on Nokia\u2019s ASIR technology, was completed in November 2025. Initial tests validated both technical integration and telepresence use cases, including a public demonstration event held in May. Eight articles were published on the project\u2019s website to make the technical and societal challenges more accessible.<\/p>\n<h2>Next Steps<\/h2>\n<p>In 2026, 5G Metro will move into real-life experimentation: connected robots, edge computing, AR\/VR, and more. The goal is to measure the impact on inclusion and lay the groundwork for a replicable European model for education and beyond.<\/p>\n<p><a href=\"https:\/\/5gmetro.imredd.fr\/2025\/12\/19\/celebrating-one-year-of-5g-metro-milestones-momentum-and-the-road-ahead\/\">Read the full article on the 5G Metro website.<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Launched in December 2024, the European 5G Metro project, led by Orange, Awabot and IMREDD, aims to build more inclusive learning environments through telepresence robotics and 5G technologies. After its first year of implementation, the project has met its objectives, with a hybrid 5G infrastructure now deployed within the IMREDD building.<\/p>","protected":false},"author":2,"featured_media":24781,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[504],"tags":[442],"class_list":["post-24780","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projets-et-recherche","tag-5g-metro","has-post-title","has-post-date","has-post-category","has-post-tag","has-post-comment","has-post-author",""],"_links":{"self":[{"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/posts\/24780","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/comments?post=24780"}],"version-history":[{"count":0,"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/posts\/24780\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/media\/24781"}],"wp:attachment":[{"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/media?parent=24780"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/categories?post=24780"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/imredd.fr\/en\/wp-json\/wp\/v2\/tags?post=24780"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}